The construction of a seaside resort on Siargao Island, Philippines, has been completed ahead by the use of an AIMIX 30 cubic meter concrete pump. The project, which initially faced big challenges, has now been completed with efficiency and cost savings. First, let’s learn about the challenges.
The client, working on a three-story seaside resort project, faced significant challenges due to the remote location and limited concrete supply. The traditional approach of relying on cranes and manual pouring proved to be a time-consuming and labor-intensive process. It took 20 hours to complete just 50 cubic meters of concrete for a single floor, with the nearest concrete batching plant located over 10 kilometers away, adding to the transporting time and costs.
The turning point came when the client decided to invest in an AIMIX ABT30C diesel concrete pump. The concrete pumping solution has greatly simplified the construction process.
The pouring concrete work became easier by using the concrete pump on-site. The time required to complete 50 cubic meters of concrete was reduced from 20 hours to 7 hours. Therefore, it has saved the construction time.
The client was highly satisfied with the AIMIX concrete pump’s performance. Not only did it ensure the project was completed ahead, but it also significantly reduced labor costs. Thanks to the versatile and reliable AIMIX concrete solution, the customer has deeply felt the importance of choosing the right construction tools and solutions for the project.
Therefore, if you also have challanges on concrete pouring or pumping, welcome to contact us for best solution right now.